Bend Joints has fabricated the gigantic Moisture Separator Reheater (MSR) shell with internals for the Nuclear Power Corporation’s (NPC) Narora Atomic Power Project and the steam, condensate and vent piping for the MSR for NPC’s Tarapur Atomic Power Project.It has executed several prestigious contracts which include the replacement of headers, loop pipes and attemperators of 4 x 50 MW Russian make boilers of CSEB’s (then MPEB) Korba East TPS. It has also successfully completed the contract for the supply and erection of 290 Economizer Coils of upper and lower banks of 210 MW BHEL boiler for CSEB’s (then MPEB) Korba West TPS.


Header pipes for boiler pressure parts : Thickness Calculation
Piping, Economizer coils, Superheater coils : Preparation of isometric drawings from plan layout drawings for Turbine Integral Piping Preparation of detailed drawings from isometric drawings Computerized data management system
Hangers & Supports : Preparation of detailed drawings Computerized data management system on the basis of approved bill of materials.
Anti-Clinker Boxes : Design, manufacture, supply, erection, commissioning; W.P. 35 kg/cm², W. Temp. 243°C
Pressure Vessels : Design, manufacture, supply, testing W.P. 60 kg/cm², Op. Temp. 430°C
Moisture Separator Reheater : Development of manufacturing, technology & NDT check list system for Kakrapara Atomic Power Project.
Blow Down Tanks : Thickness calculation
On Line Project Monitoring : www.bendjoints.com/project
Software : Autocad-2006 and Piping software (Inhouse made)
Hardware : P4 systems – 15 Nos. (Unit-I)
P4 Systems – 2 nos (Unit-II)
 
 